Engine : General Subjects - 2205/1128 |
---|
« Previous Question |
When new piping sections have been fabricated for installation in a hydraulic system, prior to installation the piping should be __________. |
A) cleaned using a water-based detergent |
B) descaled by using a pickling solution |
C) hydrostatically tested to 100% of maximum working pressure |
D) all of the above |
loading answer...
Comments |
---|
There are no comments for this question. |