How much drill water is required for transfer between drill water tanks #25 and #26 in order to correct the list of the COASTAL DRILLER with total transverse moments of -6,800 ft-kips?
A) 200 kips from tank #26 to tank #25
B) 200 kips from tank #25 to tank #26
C) 100 kips from tank #26 to tank #25
D) 100 kips from tank #25 to tank #26
loading answer...