
| Engine : Motor Plants and Auxiliary Boilers - 136/947 |
|---|
| « Previous Question |
| An exhaust gas bypass is installed on a waste heat boiler in order to __________. |
| A) bypass exhaust gas at high loads to prevent excessive back pressure |
| B) bypass a portion of the exhaust gas at peak loads for better efficiency |
| C) recycle exhaust gas to the turbocharger |
| D) minimize moisture condensation in the boiler gas passages at low loads |
loading answer...
| Comments |
|---|
| There are no comments for this question. |
