According to 46 CFR, Subchapter J (Electrical Engineering), in response to a loss of normal power or a simulated test, when will the emergency loads automatically be transferred to the emergency diesel generator? |
A) as soon as it is started |
B) when the potential from the emergency generator reaches 85 to 95 percent of its normal value |
C) when the electric potential of the ship's service generators drops to 85 to 95 percent of the normal value |
D) when the electric potential of the ship's service generators drops 15 to 40 percent below normal value |