Question #507 | |
---|---|
Link to Question
|
|
What is the purpose of the GE LM2500 gas turbine enclosure heater? | |
A) To ensure enclosure temperature is maintained at 145 degrees F | |
B) To ensure fuel viscosity is maintained while the GTE is secured | |
C) To warm up the enclosure for maintenance personnel | |
D) To increase inlet air temperature |