
Engine : Engineering Safety - 164/968 |
---|
« Previous Question |
After extinguishing a paint locker fire using the fixed CO2 system, the next immediate action is for the space to be __________. |
A) opened and burned material removed |
B) left closed with ventilation off until all boundaries are cool |
C) checked for the proper oxygen level |
D) opened and doused with water to prevent reflash |
loading answer...
Comments |
---|
There are no comments for this question. |