Log In


Engine : Steam Plants - 698/811
Get a hint
« Previous Question
When a boiler economizer is fitted with a valved bypass, Coast Guard Regulations (46 CFR) require which of the following devices to be installed?
A) A stop check valve is to be located at the economizer outlet.
B) A sentinel valve is to be fitted on the superheater outlet.
C) A stop check valve is to be located at the economizer inlet.
D) An emergency drain line must be provided to the reserve feed tank.
loading answer...
Comments
There are no comments for this question.
0 0 0%

Study Mode
Answers Only
Options
Clear Score