Log In


Engine : Electricity - 1376/1386
Get a hint
« Previous Question
As shown in the illustrated one-line diagram of a two-tiered emergency power system for a passenger ship, what statement is true? EL-0166
A) On a loss of normal ship's power, the final emergency loads power source is battery (from AC/DC UPS "A"), whereas the temporary emergency loads power source is the emergency generator.
B) On a loss of normal ship's power, the temporary emergency loads power source is battery (from AC/DC UPS "B"), whereas the final emergency loads power source is the emergency generator.
C) On a loss of normal ship's power, the final emergency loads power source is battery (from AC/DC UPS "B"), whereas the temporary emergency loads power source is the emergency generator.
D) On a loss of normal ship's power, the temporary emergency loads power source is battery (from AC/DC UPS "A"), whereas the final emergency loads power source is the emergency generator.
loading answer...
Illustration EL-0166

Click to view image

Comments
There are no comments for this question.
0 0 0%

Study Mode
Answers Only
Options
Clear Score