Log In


Engine : Expired / Gas Turbines - 171/176
Get a hint
« Previous Question
The effectiveness of an off-line wash wash of a LM2500 GTE can be enhanced by doing which of the following?
A) Stroking the Variable Stator Vanes to the maximum open position.
B) Washing the power turbine while still hot.
C) Motoring the engine just short of idle speed.
D) Applying the power turbine brake.
loading answer...
Comments
There are no comments for this question.
0 0 0%

Study Mode
Answers Only
Options
Clear Score