Log In


Engine : Expired / Refrigeration AC - 41/252
Get a hint
« Previous Question
After the refrigerant has been recovered, leaks repaired if necessary, the system ideally should undergo a dehydration evacuation prior to recharging with refrigerant. As shown in the illustration, besides the vacuum pump suction manifold isolation valve being opened, what would be the proper valve positions to accomplish and prove the evacuation? GS-RA-51
A) Valves 1, 2, and 3 should be in the mid-position and the low-side gauge manifold hand valve should be closed, and the high-side gauge manifold hand valve should be open.
B) Valves 1, 2, and 3 should be in the mid-position and the low-side gauge manifold hand valve should be open, and the high-side gauge manifold hand valve should be closed.
C) Valves 1, 2, and 3 should be front-seated and both gauge manifold hand valves should be closed.
D) Valves 1, 2, and 3 should be back-seated and both gauge manifold hand valves should be open.
loading answer...
The U.S. Coast Guard has not yet released this Illustration.
Comments
There are no comments for this question.
0 0 0%

Study Mode
Answers Only
Options
Clear Score