
Engine : Expired / Refrigeration AC - 25/252 |
---|
« Previous Question |
When purging a refrigeration gage manifold using system pressure as the source of refrigerant for purging, which of the fittings listed is normally tightened LAST? |
A) the high pressure hose fitting at the gage manifold high pressure connection |
B) the low pressure hose fitting at the suction service valve service port |
C) the low pressure hose fitting at the gage manifold low pressure connection |
D) the high pressure hose fitting at the discharge service valve service port |
loading answer...
Comments |
---|
There are no comments for this question. |