Log In


Engine : Expired / General Subjects - 1588/881
Get a hint
« Previous Question
The firefighting equipment on your general cargo vessel was last inspected by a shore side contractor 12 months ago. To remain in compliance with the Federal Code of Regulations (46 CFR), as Chief Engineer, what should your appropriate action be?
A) You should arrange an inspection of the firefighting equipment by the Third Mate.
B) Nothing needs to be done at this time.
C) You should notify the Master or the Person In Charge of the firefighting equipment to arrange for an annual inspection of the ship's firefighting equipment by a qualified shore side contractor, as soon as possible.
D) You should arrange an inspection of the ship's firefighting equipment by a qualified shore side contractor eighteen months after the date of the last inspection.
loading answer...
Comments
There are no comments for this question.
0 0 0%

Study Mode
Answers Only
Options
Clear Score