Log In


Engine : Expired / General Subjects - 1578/881
Get a hint
« Previous Question
You are installing a new refrigeration system aboard your vessel. The system comes with a 240 psi rupture disk, a safety valve set at 240 psi and a pressure gauge connection and gauge. According to the federal code of regulations, what is the preferred setup for installing the equipment on the condenser?
A) Rupture disk closest to the condenser, then pressure gauge then safety valve in series after the rupture disk.
B) The rupture disk, safety valve, and pressure gauge are all piped in parallel.
C) Pressure gauge closest to the condenser, then safety valve then rupture disk in series after the pressure gauge.
D) Safety valve closest to the condenser, then pressure gage then rupture disk in series after the safety valve.
loading answer...
Comments
There are no comments for this question.
0 0 0%

Study Mode
Answers Only
Options
Clear Score