When preparing/writing shipyard items for your vessel's upcoming dry docking period, what would you consider as an item regarding CuNi salt water cooling systems/piping? |
A) Identify in your item all steel waster piece pipe spools in the CuNi systems and require them to be removed and replaced. |
B) This item should be of no concern since you have not experienced system piping degradation/leaks. |
C) Remove certain designated CuNi piping sections for inspection. |
D) Replace all bonding pieces/wires between all CuNi system flanges. |