Deck : Safety - 2192/2841 |
---|
« Previous Question |
You are loading in a port subject to the tropical load line mark and bound for a port subject to the winter load line mark. You will enter the summer zone after steaming eight days, and you will enter the winter zone after a total of ten days. You will consume 31 tons of fuel, water, and stores per day. The hydrometer reading at the loading pier is 1.016, and the average TPI is 41. What is the minimum freeboard required at the start of the voyage? Reference Table BL-0015 below. |
A) 70 inches |
B) 64 inches |
C) 72 inches |
D) 68 inches |
loading answer...
Comments |
---|
There are no comments for this question. |