« Previous Question
You are loading in a port subject to the tropical load line mark and bound for a port subject to the winter load line mark. You will enter the summer zone after steaming six days. You will enter the winter zone after an additional three days. You will consume 28 tons of fuel, water, and stores per day. The hydrometer reading at the loading pier is 1.020, and the average TPI is 46. What is the minimum freeboard required at the start of the voyage? Reference Table BL-0012 below.
A) 61.4 inches
B) 64.5 inches
C) 70.6 inches
D) 77.5 inches