Log In


Deck : Deck General - 977/5076
Get a hint
« Previous Question
What is NOT a requirement of cargo piping installed in tank vessels carrying grade D or E cargo ONLY?
A) Connections at bulkheads must be made so that the plating does not form part of a flanged joint.
B) Flanged joints shall be used for pipe sizes exceeding 2 inches in diameter.
C) Piping through bunker spaces may be run through a pipe tunnel.
D) The cargo piping system shall be fixed.
loading answer...
Comments
There are no comments for this question.
0 0 0%

Study Mode
Answers Only
Options
Clear Score