
Deck : Deck General - 5352/5076 |
---|
« Previous Question |
An LNG vessel containment system must be cooled down prior to loading cargo. Where are the cool-down parameters and rates obtained from? |
A) the instruction manual provided by the manufacturer of the containment system |
B) the port engineer |
C) either the master or chief engineer probably knows this information |
D) the knowledgeable shoreside loading terminal personnel |
loading answer...
Comments |
---|
There are no comments for this question. |