| The DEEP DRILLER is on location during a storm. Windward anchor tensions begin to exceed the test tensions. To reduce tensions while minimizing offset over the well, you should __________. |
| A) increase tension on the leeward chain |
| B) pay out more chain on the windward side |
| C) reduce tension on the leeward chains |