Log In


Deck : Deck General - 5174/5076
Get a hint
« Previous Question
The DEEP DRILLER is drilling at 60 feet draft at a corrected KG of 54.0 feet. Ballast added or discharged to remain at a constant draft is at a VCG of 10 feet. How much non-liquid load would have to be removed from an average height of 130 feet above the keel to meet the maximum allowable KG at a draft of 60 feet for winds greater than 70 knots?
A) 1283 long tons
B) 817 long tons
C) 679 long tons
D) 302 long tons
loading answer...
Comments
There are no comments for this question.
0 0 0%

Study Mode
Answers Only
Options
Clear Score