| Deck : Deck General - 5126/5076 |
|---|
| « Previous Question |
| When two ballast pumps used for deballasting a single tank start cavitating, you should __________. |
| A) close the valve on the discharge side of the pump to re-acquire suction |
| B) open all valves on the discharge side to permit improved flow |
| C) shut down one pump |
| D) close the valve on the suction side of the ballast pump to re-prime the pump |
loading answer...