| What port-side valves must be open to transfer ballast from Tank 1P to Tank 10P on the DEEP DRILLER using the Port #1 ballast pump? |
| A) 1, 34, 35, and 23 |
| B) 1, 33, 44, 45, and 23 |
| C) 1, 33, 43, and 24 |
| D) 1, 33, 43, 48, and 23 |