
| Deck : Deck General - 5070/5076 |
|---|
| « Previous Question |
| How much additional solid weight could be loaded at a VCG of 189.7 feet on the DEEP DRILLER while loaded as shown in the Sample Load Form #4 (Drilling)? Assume ballast added or discharged to maintain draft is done so at 15 feet above the baseline. |
| A) 279.2 long tons |
| B) 314.2 long tons |
| C) 404.2 long tons |
| D) 461.9 long tons |
loading answer...
| Comments |
|---|
| There are no comments for this question. |
