
Deck : Deck General - 5037/5076 |
---|
« Previous Question |
While elevated, the COASTAL DRILLER prepares for a severe storm. When the setback is lowered and placed in the pipe racks, it is considered as part of the __________. |
A) basic loads |
B) storm loads |
C) variable loads |
D) fixed loads |
loading answer...
Comments |
---|
There are no comments for this question. |