| Deck : Deck General - 4656/5076 |
|---|
| « Previous Question |
| The DEEP DRILLER is loaded as shown in the Sample Load Form #5 (Survival) when an unexpected slowly increasing port list and bow down trim occurs. A leak in C1P is found. By deballasting from ballast tanks 2P and 3P, the inclination slowly decreases. The increase in the transverse free surface correction is __________. |
| A) 1.25 feet |
| B) 0.82 foot |
| C) 0.34 foot |
| D) 0.18 foot |
loading answer...
| Comments |
|---|
| There are no comments for this question. |