The DEEP DRILLER is loaded as shown in the Sample Load Form Number 5 (Survival) when an unexpected slowly increasing starboard list and bow down trim occurs. A leak in 1S is found. By deballasting from ballast tanks 2S and 3S, the inclination slowly decreases. The increase in the longitudinal free surface correction is __________.
A) 1.25 feet
B) 0.90 foot
C) 0.83 foot
D) 0.34 foot