
| Deck : Deck General - 4456/5076 |
|---|
| « Previous Question |
| The COASTAL DRILLER is loaded as shown in the Sample Load Form Number 1 (Rig Move). If the contents of 6 and 7 drill water tanks are discharged, what would be the new height of the transverse metacenter? |
| A) 134.95 feet |
| B) 135.91 feet |
| C) 136.38 feet |
| D) 136.89 feet |
loading answer...
| Comments |
|---|
| There are no comments for this question. |
