
| Deck : Deck General - 4232/5076 |
|---|
| « Previous Question |
| The DEEP DRILLER is loaded as shown in the Sample Load Form #3 (Preparing to Drill). If the liquid mud in mud pit #1 (see table 8) is dumped, what would be the new draft? |
| A) 60 feet 9.6 inches |
| B) 59 feet 9.3 inches |
| C) 59 feet 2.7 inches |
| D) 56 feet 10.9 inches |
loading answer...
| Comments |
|---|
| There are no comments for this question. |
