
| Deck : Expired / Deck General - 1294/199 |
|---|
| « Previous Question |
| An LNG vessel contaiment system must be cooled down prior to loading cargo. Where are the cool-down parameters and rates obtained from? |
| A) the instruction manual provided by the manufacturer of the containment system |
| B) the knowledgable shoreside loading terminal personnel |
| C) either the master or chief engineer probably knows this information |
| D) the port engineer |
loading answer...
| Comments |
|---|
| There are no comments for this question. |
