
| Engine : General Subjects - 2205/1128 |
|---|
| « Previous Question |
| When new piping sections have been fabricated for installation in a hydraulic system, prior to installation the piping should be __________. |
| A) cleaned using a water-based detergent |
| B) descaled by using a pickling solution |
| C) hydrostatically tested to 100% of maximum working pressure |
| D) all of the above |
loading answer...
| Comments |
|---|
| There are no comments for this question. |
