While the DEEP DRILLER is loaded as shown in Sample Form #4 (Drilling), casing is accidentally dropped over the starboard side.  Because the sounding level and starboard inclination are rapidly increasing, you decide that tank 1S is damaged. Your best countermeasure is to __________ .
A) deballast from tank 2S
B) dump the mud
C) counterflood into 9P
D) place a wooden plug into the vent of tank 2S