Question #1016 | |
---|---|
Link to Question | |
As shown in the illustrated plots of uncorrected and temperature corrected insulation resistance readings for a particular piece of equipment, at what point in time should the equipment have been refurbished or replaced? Illustration EL-0120 | |
A) 2006 | |
B) 2008 | |
C) 2010 | |
D) no refurbishment or replacement was necessary through 2011 |
Posted: 07 Apr 2020 00:18 UTC | Post #1 |
---|---|
mariousa11 Deck & Engine |
Expired Member Total Posts: 2 |
The question is " at what time should had been referbidhed' not if it needed to. | |
Posted: 24 Nov 2022 05:34 UTC | Post #2 |
H Q service Deck & Engine |
Registered Total Posts: 7662 |
Enjoyed looking through this, very good stuff, regards . ufabet เว็บหลัก | |
Posted: 10 Jan 2023 07:05 UTC | Post #3 |
H Q service Deck & Engine |
Registered Total Posts: 7662 |
Hello there, you web site is incredibly funny he informed me to cheer up .. Merry Christmas” the mystical teachings of jesus |
1 / 1