| Question #998 | |
|---|---|
| Link to Question | |
| Which of the listed conditions occur when selection is made for 'third point hoist' on the winch hoist controller shown in the illustration? EL-0102 | |
| A) Master switch contacts "4","5", and "6" close. | |
| B) Contactors 'H', '1A' and '2A' drop out. | |
| C) Master switch contacts "4","7", and "8" close. | |
| D) Contactors 'H, '3A', '4A' pick up. | |
| Posted: 20 May 2015 14:06 UTC | Post #1 |
|---|---|
| delgado2015 Engine |
Member Total Posts: 2 |
| How is this correct? should'nt it be 3,4,6,8,9 closed? | |
1 / 1
